Finally, there’s some light at the end of the
tunnel. A first section of the layout is fully track layed. Once again, paper
plan was just an indication and things were worked around a little bit on site to get
the most from the available space.
So far, I’m particularly satisfied. The track plan may look complex but is in fact very simple and easy to work. There’s enough activity there to suggest this is a very large mill desserving to be the powerhouse of the subdivision.
I like the two long sidings used to store
chemicals and woodchips. I didn’t thought it would look so good and see a lot
of scenic potential there.
Locating the woodchips unloader wasn’t an easy
task and I tried 3 configurations before I was fully satisfied. I wanted the
building to be far enough from the fascia to be able to model the little dirt
access road running parallel to it. I’m not that fond of buildings located too
much in the foreground. The remaining space between the two sidings and the
long storage track in the background will be occupied by different sheds and
tools just like the prototype.
I made the storage track a little bit wavy to
give it some visual interest and optimize the space for the sheds and woodchips
piles.
Operation wise, I think the best option is the
following. CN pulls outbound cars directly from Donohue and replaced them with
inbound cars. That means no need for complex operations at Clermont. This diminutive yard is too small to handle
long freight trains (more than 10 cars). I would also make the layout
cluttered. Instead, Clermont will be considered a passing siding and the small
siding as team track for various customers in Clermont. This way, the new team
track will be a good opportunity to model typical activities from Murray Bay
Sub we couldn’t do before: oil, finished lumber, propane, electric wire
(General Cable), crushed stone, grain, fertilizers and others. This is a very
small part of traffic, but gives some variety. One must remember there’s an
industrial park in Clermont located at Wieland where you could find many
rail-served industries (feeds mill, lumber loading area, propane dealer,
General Cable and a few others). I feel it really gives Clermont the importance
it needs to be the end of the line top station. Better, it means the crew
operating the 522-523 train have real switching duties which makes running this
train more than picking up cars at large industries.
I also filled the parking lot with various cars
and trucks typical of the era I had acquired over the years. Didn’t know I had
so much of them! I’ll need to get more pick-up trucks because they are so
popular in remote areas like Clermont.
As you can see, I’m starting to almost like the
Atlas CN GP40 with their badly shaped cab nose. I’ll have to give some thought
about weathering and upgrading them.
Next time, we will wire and test the track.
No comments:
Post a Comment