Friday, March 29, 2024

MMA Blues - Or Repurposing The Overlap

Once upon a time, Chris Mears invented The Overlap – a clever compression of two distant scenes in one small layout. The goal was to depict two ends of a branchline or an operation, while providing a visual break on a cassette which was to be understood as miles travelled. Recently, someone dug the concept from an excellent James Hilton’s inspiration book and it got my brain working again. Kitchen renovations have taken me away from modelling, but the train bug never dies that easy, so I started to exchange ideas with Chris, including how The Overlap could become a nice little paper mill based on Donnacona, or more likely, East Angus. Recycling old ideas is a trope of this blog, so with not indulge in it!

 

An early sketch

The idea evolved when YouTube decided to suggest a few videos of two turnouts layouts which sparked again my creativity because of there closeness to The Overlap. All featured a cassette or staged the train directly on the layout. I’ve never been a big fan of both ideas because they feel artificial to me and seem like artifices created to compensate for a lack of oversight. That said, it’s my own prejudice because I’m well aware these designs do work well and aren’t the result of poor design. However, rethinking about my interest in Southern Quebec railways, I wondered if I couldn’t combine these basic ideas with The Overlap and, probably, a pinch of British design.

 


The overall layout should be self contained, able to run train of 3 long covered hoppers and a caboose/shoving platform. The template was the top of a set of IKEA Kallax shelfs, providing for an 8 ft by 14 inches footprint. From experience, I knew it was long enough for operation.

 

Two separate scenes for different experience

Then, it was time to develop the idea. The key element was to stage the train out of our view so the distant originating point would be invisible, creating a surprise when it enters the scene and getting rid of selective compression. In that regard, the staging area would be in fact a UK-style hidden fiddle yard at the back of the layout.

 

MMA train over St-Pie bridge (credit: unknown)

The junction between the hidden staging and the layout would be a heavily forested area as is so common in old Southern Quebec villages. On the right would be the switching lead, disguised as a chunk of the mainline. It would be, in itself, a scene that I would call the “Bridge” or the “Mainline”. It is a place where you can railfan the train as it moves over and over that 36 inches stretch of track. Inspired by Ste-Pie, an agricultural village once served by MMA, that mainline could be a long bridge crossing a calm river. Both ends of that scene would be hidden by mature trees, making it truly a window through which you can admire the rolling stock and motive power at work. To enhance and dramatize that setup, the track would be angled toward the viewer, adding an element of dynamism, both visual and auditive.

 

Refining the concept

The train would then reverse course to reach an industry – probably a feed mill and a lumber supply. These mid-size mills and elevators were a common sight on MMA and having that rural hardware store is always a neat way to frame a scene. Once again, trees would surround that piece of land to create a railfanning alcove or bubble. Here, cars are spotted and shunted. While the river scene is distant, the feed mill is at the human scale, directly accessible and open toward the public and the operator. When direct human contact is required with the train, the scene naturally opens toward the people in the room. On the other hard, the river scene, which probably would feature a truss bridge, would be “distant” with the train running behind trees, over the water and shrouded by the bridge metallic structure.

 

 

Saturday, March 9, 2024

Ciment St-Laurent - Part 2

Ciment St-Laurent is a slow burning thing... we thought it would be fast, but such a large structure do require some serious thought to assemble. But we all know how putting a deadline on layout projects is generally a waste of time.


That said, we have made some interesting progress, mainly related to the bagging plant which may be considered one of the simplest part of this industrial complex.

1950s rolling doors are made of corrugated paper

The MDF structure core was built years ago, but required some touch up. A new 1/4" high foundation was added under the core so the conveyor structure linking the bagging plant to the silos would sit at the right height. A new loading platform and an overhung roof were also glued in place according to prototype pictures.


Another feature is the doors location which, contrary to our initial assesment, were centered but are offset toward the right. This is a strange arrangement, but it probably means so industrial equipment was located on the left side of the warehouse. On the other hand, this offset location creates a more dynamic facade to this otherwise very boring building.

As with the cement plant itself, the structure is cladded with extra fine corrugated cardboard mounted on thick paper strips to replicate the overlapping effect. Even if the bagging plant isn't complete yet, once on the layout, it instantly improves greatly the industrial appearance of that scene! I can't help but see the entire cement plant done soon!


Sunday, February 11, 2024

Ciment St-Laurent - Part 1

Life has been busier than I could expect in recent weeks and several unpredictable events unfolded... some sad, some happy. That said, I forgot for a while this blog but modelling has been active, both on Monk and the Murray Bay Subdivision.

The new structure is a 1:1 replica of the real plant

One of the biggest step forward is our commitment to complete the large Ciment St-Laurent plant in Villeneuve. The current (now dismantled) structure was a half baked mockup that needed to be replaced by something more permanent. Learning from our initial mistakes, we have greatly improved our construction methods and the new cement plant is both more realistic and practical.

Rails embedded into 3/4" thick MDF

It was decided to start from scratch, including the sub-roadbed. We wanted to replicate the loading track embedded into the structure concrete pad and it called for a new slab of thick MDF. After fiddling around and finding out the layout was not level due to warping caused by our decade ago sloppy craftsmanship, we decided to screw the pad to the wood dowel columns to create a strong and sturdy assembly. It seems to work!

Fixing the MDF concrete slab to the structure

Another hurdle was dealing with cladding. On several buildings on the layout, we have been using white extra fine corrugated cardboard. This is a very useful material to replicate old asbestos corrugated sheathing from the 1950s. Unfortunately, it's getting very hard to source and three previous attempts miserably failed from several suppliers: what they advertised has extra fine, was in fact fine... and don't be fooled, by fine, I mean OK for O scale. Another option was using corrugated styrene, but it's extremely costly and it's a pain to glue on MDF without using a lot of CA or epoxy. Didn't want to go that route.

Working with paper cladding is easy, simple and efficent

Finally, frustrated, I decided to give a second look at scrapbooking suppliers and found one, Doris from Germany, that claimed to sell extra fine corrugated cardboard. The listed dimensions fitted what had been used on Donohue and I ordered a bunch. Several week later, it was a joy to discover it was the right material and the cement plant project could go forward.

Laying thin cardboard strips to create the overlap effect

As for cladding the building, I like to overlap the individual rows of sheets. You can't do that in HO scale due to the cardboard thickness, but a way around that is simply to cut the row to the correct length and glue a thin 0.25mm cardboard strip at the bottom. It creates a subtle yet realistic overlap that brings some relief to the surface. When all glued in place, you get a very neat appearance and it only takes a few minutes to assemble because MDF and cardboard bond together quite fast when using regular carpenter glue.

A completed wall!

For vertical lines between individual sheets, I will use a dark pencil and draw them. I don't see the need to model these joints in real. If I was dealing with corrugated paper or tin foil, that would be another matter!

Thursday, January 11, 2024

3D Printed Curved Track Templates

Track templates to lay curved tracks are notoriously expensive. Metal ones are great for sturdiness and plastic ones such as Peco Tracksetta are quite versatile with their various slots for nailing tracks. Unfortunately, they have two main shortcomings: uneconomical and available only in a very few radii that aren’t always suitable for our needs.

 

I have no issue with costly specialized tools when they are extremely useful and that the efficiency gained covered the expense in a meaningful way. You accept to pay a little bit more to save time and get better results. It makes sense. But selling plastic injection templates that have been out there for decades, are the results of very little engineering skills and don’t offer flexibility makes just no sense to me. If you need to lay several curves of a fixed radius, they may make sense, but if you track plan requires several different radii, these tools make no sense.

 

Hence, I decided to make my own template. The radii I need are 27’’, 28’’, 30’’, 37’’, 38’’ and 40’’. Let’s just say these aren’t standard! I made mine by drawing them in SketchUp and 3D printing them. They are similar to the metal ones, but I could easily see myself adding a few holes here and there to give more nailing track options.


Printing and cleaning them took 2 hours for 6 templates and cost a little bit under 25 cents (Canadian dollars, mind you!). At this price, there is no excuse not to print them even for smaller jobs.


With these useful tools, I was able to improve the track flow in the staging yard by bumping the minimum radius at 27”, which provides for much better running performance with full length passenger cars. I will still have to improve (read surgery) for some cars to track better over the 24’’/28’’ radii curved turnouts. That said, there will probably be a restriction for long passenger trains having to run only over the larger radius on these curved turnouts.

 

Making templates is another way that 3D printing can be used. It could be very useful for special trackwork or as a kitbashing template. I expect to explore more of these options as I built the layout.

Wednesday, January 3, 2024

Monk Subdivision - Mike Confalone Was Right

 I've always been a planner at heart and this is no surprise my line of work is architecture. However, when dealing with a hobby, time rare and spending it by the dozen over things that don't move forward is both uninteresting and self defeating. I recall reading a few years ago that Mike Confalone confessed to be a poor planner, having little patience nor talent for it. That said, he compensated by working directly on the workbench, making countless mistakes he could have resolved before and finding solutions as he went ahead. What a haphazard way to build a railway empire isn't it?

For sure, we could say that Mike is somewhat dumb to not have learn his lesson after all these years... but upon further investigation, Mike isn't dumb. He has just found that making a mistake and correcting it takes less time than over planning a bulletproof ideal theory. It's not a call to not plan, but to recognize that moment when you have worked your main ideas well enough to commit to build. With a clear picture in your mind and a good step by step approach, you can move forward at an incredible pace.

Countless mistakes were made... but all were resolved in a morning

The reason why I'm writing about that subject is because I spent very little time behind the computer lately but a lot at the benchwork. In many case, I wanted to make sure the solutions to implement were perfect, yet, without the computer, I had no other choice than commit myself and cut some lumber. Bear in mind, I made a lot of mistakes even if I've been planning that layout for four years now... (yeah, you read that correctly, four years of doing very little). In many case, making the mistake generally took less than 10 minutes and correcting it was done before the hour mark. Let's recall a few examples:

When I cut the holes in the walls, I had a good idea where the tracks would punch through it, yet, I made them too big and too high. Cutting holes took about 5 minutes and making them right took less than an hour, including paint. At one moment, I went to the computer to check a few things on XtrkCAD and a good 45 minutes was lost and I learned very little that I didn't know from cutting wood in the basement.

Later, I found out the benchwork was installed 1/4" too low compared to the original benchwork on the other room. I was devastated after spending a day building it perfectly level... Yet, unscrewing the entire thing and raising it up took about 45 minutes, which is less time than checking your emails and Facebook.

Few days later, I installed the roadbed in the wrong angle in the yard. A mistake of 2 degrees that made the minimum radius in the area to be too sharp. I took 15 minutes to understand  how I made the mistake and how I could correct it. 30 minutes later, it was all done.

Finally, today I found out a lot of things weren't right with the swing bridge I built 2 years ago. A quick level check made it clear the vertical post holding the hinges wasn't vertical at all. It could have been a big task to correct it, but in fact, it was done in less than 20 minutes. Later on, I cut a hole for the track in the curved backdrop. As expected, even if I did measure it twice, I made a mistake.. no biggies, I corrected it and made a filler piece were I cut too much material. Once again, it was a matter of minutes.

I'm certainly not apologizing for poor craftsmanship. But at the end of the day, this is layout building and not layout agonizing. I know myself and in most of these cases, I would have hesitated for days before cutting anything, then after realizing I made a mistake, I would have gone back to over planning. These things would have consumed several days, if not an entire week. Now, let's do the math and you will see that making and correcting about 5 mistakes in the last week took about 5 hours at best and the project moved forward at an incredible pace. 

It's always down to an effort/effect ratio. Committing to your actions will always be more proactive than curling up in a corner and overthinking what are at worse very basic carpentry issues that are better resolved with tools and some positive thinking.