Sunday, May 22, 2016
Planting Utility Poles and Small Details
Yesterday was a good day to install the new set of utility poles. While I made many of them, I tsill ran short of about 9 of them to complete the D'Estimauville and Villeneuve scenes.
On the same occasion, relay boxes found their way on the layout while signs were brought back.
The result is very interesting and the next step will be to add switch stands (and perhaps make them workable in an unforeseen future).
Subscribe to:
Post Comments (Atom)
Those utility poles are amazing. Well done!
ReplyDeleteThanks Steve! And easier to build than it look.
Delete