As for the layout, we set our goals at completing, as much as possible, the basic scenery in Clermont. This has lagged for too long and we have now enough experience to move forward at a sustained speed. As this point, all roads are cut and some will need to be painted and weathered. It shouldn't be to hard thought "Mill Street" is a 10 feet long single piece of illustration board. It will be tricky to paint and detail such a large street. I can't do it on my workbench, but maybe in the garage.
In terms of scenery, I also started adding the rip rap on Rivière Malbaie using real stones sourced directly from the river on that spot. It really brings together the scene and I can't wait completing the embankments vegetation! Also, I installed the custom made plaster bridge pillar in the middle of the river. It was made about 5 or 6 years ago but I waited a long time before setting it on the layout for fear of chipping the plaster. Some paint repairs are to be expected and I'm seriously thinking about giving it a coat or two of dullcote to protect it a little bit better. Incidently, I'm not a fan of painted plaster...
As for the river bed itself, I'll probably smooth it with spackle then paint and varnish it. I'm planning to use Liquitex Modelling Paste to create realistic waves in the river or another similar product. I don't see the need for pouring resin there. Malbaie Rivier is a powerful mountain river, not a plain creek or a canal.
With that said, I hope everyone is doing OK. I still have a few projects I didn't share publicly and hope to discuss about them soon.
How about party light strings - https://www.partylights.com/48-Medium-Base-Stringer-Black.
ReplyDeletesee their implementation at http://modelingthewwsl.blogspot.com/2020/03/lighting-concept.html and http://www.lkorailroad.com.